Articles in this section

Glossary: ActivTrak for BI - Headcount Planning

This glossary will help you understand the key metrics and terminology used in ActivTrak for BI - Headcount Planning. Use this reference to interpret dashboard data and effectively communicate findings on capacity and cost to your finance and HR teams.

% of Expected Days Worked

Definition
A parameter representing the share of available weekdays in the period a user is realistically expected to be working, accounting for PTO, holidays, and part-time schedules.

 

Example
March 2026 has 21 weekdays. At the default 85% setting, a typical user is expected to work about 18 of those days, with the remaining 3 days accounted for by holidays, occasional sick time, or PTO built into the average.

 

Where to find it

Parameter Setting

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

% of Productivity Goal Achieved

Definition
The percentage of expected productive hours a user actually logged. This is the core comparison metric behind every other capacity calculation in the report.

 

Calculation
(Total Productive Hrs / Expected Total Productive Hrs) x 100%

 

Example
Zoe T. logged 4 productive hours against an Expected Total Productive Hrs of about 116 for March, putting her % of Productivity Goal Achieved around 3% - far below the configured 90% floor of the At Capacity range. That gap is exactly why she shows up with a 0.97 Available Capacity FTE and $17,005 in Available Capacity Cost.

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

At Capacity

Definition
A calculation that identifies users performing within their expected productivity range: neither significantly under- nor overutilized. This logic excludes these users from the Available Capacity FTE calculation, since a user already at their expected output has no available capacity to report.

 

Calculation
1 - (Available Capacity Buffer) ≤ (% of Productivity Goal Achieved) ≤ 1 + (Available Capacity Buffer)

At the default 10% buffer: 90%-110%.

 

Example
A Professional-level user with 116 Expected Total Productive Hrs who logs 112 actual hours is at roughly 97% of goal - squarely inside the 90%-110% At Capacity range. This user contributes to headcount totals and payroll cost but is excluded from the Available Capacity FTE calculation and won't appear in the High/Medium/Low Available Capacity breakdown, since they're already fully utilized at their current staffing level.

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Available Capacity Buffer

Definition
A tolerance parameter that creates a band around 100% productivity goal achievement, within which a user is treated as At Capacity rather than over- or underutilized.

 

Example
With the default 10% buffer, any user achieving between 90% and 110% of their productivity goal is treated as fully staffed at their current level - no available capacity to reallocate.

 

Where to find it

Parameter Setting

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Available Capacity Cost

Definition
The dollar value of unused productive capacity for a user, team, or the organization - the portion of paid salary tied to time that isn't being converted into expected productive output.

 

Example
In the Headcount Planning Summary report, Available Capacity Cost for March 2026 totals $43.7K, annualized to $523.9K. Broken out by team, Engineering accounts for $29.8K of that (the largest single share), followed by Marketing at $5.3K, Sales at $4.5K, and Solutions and Customer Success each at $2.1K.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Available Capacity Cost Ratio

Definition
Available Capacity Cost expressed as a percentage of Total Paid Salary - the share of payroll spend currently tied up in unused capacity rather than expected productive output.

 

Calculation
(Available Capacity Cost / [Total Paid Salary) x 100%

 

Example
With Total Paid Salary at $1.2M and Available Capacity Cost at $43.7K for March 2026, the org-wide Available Capacity Cost Ratio comes out to roughly 3.6% - meaning about 3.6 cents of every payroll dollar that month is tied to underutilized time.

 

Where to find it

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Available Capacity FTE

Definition
The amount of unused productive capacity a user has, expressed as a fraction of a full-time equivalent (FTE). Represents how much additional work a user could realistically absorb without exceeding their current expectations.

 

Calculation
IF a user is not classified as Over Capacity or At Capacity, THEN:
[(Expected Total Productive Hrs) - (Total Productive Hrs)] / (Expected Total Productive Hrs) = 1 - (% of Productivity Goal Achieved]

 

Example
Zoe T. shows an Available Capacity FTE of 0.97 in the Analysis by Team & Level report - meaning she's using only about 3% of her expected productive capacity, which reads as having nearly a full FTE's worth of bandwidth free. Contrast that with Oscar B. at 0.27 Available Capacity FTE - he's using about 73% of expected capacity, leaving roughly a quarter of an FTE free.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Available Capacity FTE Ratio

Definition
Available Capacity FTE aggregated across a team, level, or the whole organization and expressed as a percentage of total FTE - the share of your total workforce capacity that's currently sitting unused.

 

Calculation
Sum of Available Capacity FTE / Total FTE

 

Example
In the Headcount Planning Summary report, Available Capacity FTE shows 4.1 with a 4% FTE Ratio out of 112 total users for March 2026.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Employee Level

Definition
A filter and breakdown dimension that groups users by role level - for example, VP, Director, Manager, Professional, or Associate.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Expected Total Productive Hrs

Definition
The total number of productive hours a user is expected to log across the reporting period, based on their working days and productivity goal. This is the benchmark every user's actual output is measured against.

 

Calculation
Total Weekdays x % of Expected Days Worked x Productivity Goal

 

Example
For March 2026 (21 weekdays), with % of Expected Days Worked at 85% and a Productivity Goal of 6.5 hours/day: 21 × 0.85 × 6.5 ≈ 116 Expected Total Productive Hrs for that user for the month.

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

High Available Capacity

Definition
The tier of the User Available Capacity classification assigned to users with the most unused productive capacity.

 

Calculation
Available Capacity FTE > High Available Capacity Threshold

 

Example
In the Headcount Planning Summary report, the High Available Capacity card shows 2 Users, 2% of total for March 2026. In the Analysis by Team & Level report, the User Capacity Summary table shows those two users are Zoe T. (0.97 Available Capacity FTE) and Michelle P. (0.99 Available Capacity FTE).

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

High Available Capacity Threshold

Definition
A parameter that sets the cutoff between the Medium and High Available Capacity tiers.

 

Example
At the default 50% setting, a user needs to have more than half of their expected productive capacity going unused to land in the High tier.

 

Where to find it

Parameter Setting

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Low Available Capacity

Definition
The tier of the User Available Capacity classification assigned to users with the least unused productive capacity.

 

Calculation
Available Capacity FTE < Low Available Capacity Threshold

 

Example
In Headcount Planning Summary report, the Low Available Capacity card shows 7 Users, 6% of total for March 2026. In the Analysis by Team & Level report, the User Capacity Summary table shows those users include Oscar B. (0.27), Joe O. (0.16), Allison E. (0.23), Jackson Y. (0.22), Mary E. (0.15), and George V. (0.20).

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Low Available Capacity Threshold

Definition
A parameter that sets the cutoff between the Low and Medium Available Capacity tiers.

 

Example
At the default 30% setting, a user needs to have less than 30% of their expected productive capacity going unused to land in the Low tier.

 

Where to find it

Parameter Setting

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Medium Available Capacity

Definition
The tier of the User Available Capacity classification assigned to users with a moderate amount of unused productive capacity.

 

Calculation
Low Available Capacity Threshold ≤ Available Capacity FTE ≤ High Available Capacity Threshold

 

Example
In the Headcount Planning Summary report, the Medium Available Capacity card shows 2 Users, 2% of total for March 2026. In the Analysis by Team & Level report, the User Capacity Summary table shows those two users are Angela Y. (0.42 Available Capacity FTE) and Alicia F. (0.39 Available Capacity FTE).

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Over Capacity

Definition
A calculation that identifies users whose actual productivity exceeds their expected productivity by more than the Available Capacity Buffer allows. This logic that excludes these users from the Available Capacity FTE calculation, since a user working beyond expectations has no available capacity to report.

 

Calculation
% of Productivity Goal Achieved > 1 + Available Capacity Buffer

At the default 10% buffer: greater than 110%.

 

Example
A Manager-level user on the Engineering team with an Expected Total Productive Hrs of 116 for the month who logs 135 hours is at about 116% of goal - past the 110% Over Capacity line. Because the Available Capacity FTE formula only applies to users who are not over or at capacity, this user is excluded from the calculation and won't appear in the High/Medium/Low Available Capacity breakdown.

 

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Productivity Goal

Definition
The expected number of productive hours a user should log per weekday. This baseline drives every other capacity calculation in the report.


See Set Productivity Goals to learn more about each goal type and how to configure them.

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Team

Definition
An organizational unit in ActivTrak that groups users together based on shared characteristics such as department, function, reporting structure, or project assignment. Teams (also known as Groups) serve as a primary filter for analyzing schedule adherence data and enable comparative analysis across different groups within an organization.

Teams in ActivTrak:

  • Created and managed by administrators
  • Allow for hierarchical structures (teams within teams)
  • Serve as filters for dashboards and reports
  • Enable team-level goal setting and benchmarking
  • Provide context for productivity comparisons

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*
All packages

*Requires ActivConnect API (Add-on)

Total Paid Salary

Definition
The total compensation paid to all users in scope for the selected period, annualized to support budget and workforce planning conversations.

 

Calculation
Sum of paid salary across all users in scope for the selected Year Month; Annualized figure projects that monthly total across a full year.

 

Example
The Summary page shows Total Paid Salary at $1.2M for March 2026, with an Annualized figure of $14M. That annualized number is what finance typically anchors to when framing the scale of an Available Capacity Cost finding: $523.9K in annualized Available Capacity Cost against a $14M annualized payroll base means roughly 3.6% of total compensation spend is tied to underutilized time.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

User

Individual employees or contractors whose digital activity is being tracked through the ActivTrak agent software. In ActivTrak, a "user" typically corresponds to a specific person whose work habits, productivity, and application usage are monitored and analyzed within the platform.


Key aspects of users in ActivTrak:

  • Each user typically requires one license in the ActivTrak system
  • Users are organized into teams for analysis and reporting
  • User data forms the foundation for all productivity metrics
  • Users can be assigned specific productivity benchmarks and goals
  • User privacy settings can be configured according to organizational policies

 

All packages

*Requires ActivConnect API (Add-on)

User Available Capacity

Definition
A three-tier classification (High, Medium, or Low) assigned to each user based on their Available Capacity FTE, used to prioritize where meaningful bench strength exists across the organization.

 

Example
In the Analysis by Team & Level report's User Capacity Summary table, Zoe T. and Michelle P. are High Available Capacity, Angela Y. and Alicia F. are Medium, and the remaining seven users - including Oscar B. and Joe O. - are Low. These three tiers are what the Headcount Planning Summary page's High/Medium/Low Available Capacity cards count directly.

 

Where to find it

Headcount Planning Summary:

Analysis by Team & Level

 

Package availability*

All packages

*Requires ActivConnect API (Add-on)

Was this article helpful?
0 out of 0 found this helpful